It’s about a network in the city, that connects the riverside with the empty fountain at the centre of Stadtpark, the proposed new city centre.
These large ‘tubes’ begin from the Donau, or the green areas, forming inclinations and shapes suitable for seating, laying, skating or bicycling. Sometimes they even form a building. The starting point is the river and its silent sound, the ducts, the marina side..
These empty ‘pots of life’ transfer the sound of all these human activities and bring it to the city’s center. It works like communicating vessels. The one brings life to the other. The sound of the activities connected each other and mixed up. Its like standing under the bridge, at the city’s entrance and hear all this noise, the vibrant, enlarged sound of moving, back and forward.


No comments:
Post a Comment